{"id":537,"date":"2016-02-22T03:45:30","date_gmt":"2016-02-22T03:45:30","guid":{"rendered":"http:\/\/www.chrisbrownrealestate.ca\/blog\/?p=537"},"modified":"2016-02-22T03:45:30","modified_gmt":"2016-02-22T03:45:30","slug":"50-million-redesign-of-the-mountain-highway-interchange-largely-complete","status":"publish","type":"post","link":"https:\/\/www.chrisbrownrealestate.ca\/blog\/50-million-redesign-of-the-mountain-highway-interchange-largely-complete\/","title":{"rendered":"$50-million redesign of the Mountain Highway interchange largely complete"},"content":{"rendered":"<div id=\"attachment_538\" style=\"width: 573px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.chrisbrownrealestate.ca\/blog\/wp-content\/uploads\/2016\/02\/interchange.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-538\" class=\"size-full wp-image-538\" src=\"http:\/\/www.chrisbrownrealestate.ca\/blog\/wp-content\/uploads\/2016\/02\/interchange.jpg\" alt=\"The Highway 1 at Mountain Highway interchange project includes four ramps, a new, wider structure with signalized intersections, and realignment of Mountain Highway to Brooksbank Avenue at Keith Road.\" width=\"563\" height=\"375\" srcset=\"https:\/\/www.chrisbrownrealestate.ca\/blog\/wp-content\/uploads\/2016\/02\/interchange.jpg 563w, https:\/\/www.chrisbrownrealestate.ca\/blog\/wp-content\/uploads\/2016\/02\/interchange-300x199.jpg 300w\" sizes=\"(max-width: 563px) 100vw, 563px\" \/><\/a><p id=\"caption-attachment-538\" class=\"wp-caption-text\">The Highway 1 at Mountain Highway interchange project includes four ramps, a new, wider structure with signalized intersections, and realignment of Mountain Highway to Brooksbank Avenue at Keith Road.<\/p><\/div>\n<p>Basic design work and public consultation for a $50-million redesign of the Mountain Highway interchange is now largely complete, but we are still waiting to hear whether the preferred option involving a new bridge over Lynn Creek eastbound on-ramp for Lynn Valley residents will be funded.<\/p>\n<p>\u201cWe\u2019re in a stage right now where we\u2019re trying to finalize the design \u2013 that whatever is built meets the needs of both North Vancouver district and those that are travelling on the freeway. It\u2019s a very difficult section of the road because you\u2019ve got all these on- and off-ramps,\u201d said David Stuart, District of North Vancouver chief administrative officer.<\/p>\n<p>The current design\u00a0 features a new four-lane Mountain Highway overpass connecting with Brooksbank Avenue, a southbound exit lane and off-ramp from the Cut, a new northbound on-ramp to the Cut from Mountain Highway and some painted bike lanes and controlled intersections.<\/p>\n<p>What it doesn\u2019t have, many residents pointed out at recent public meetings on the project, is an eastbound on-ramp for residents coming down Mountain Highway from Lynn Valley.<\/p>\n<p>\u201cThat\u2019s not the ideal situation but the challenge is the ministry cannot put that left-turn or eastbound access route in without widening the orange highway bridge because you\u2019ll need a merge lane that runs several hundred metres,\u201d said district Mayor Richard Walton.<\/p>\n<p>That would mean installing a new, wider Highway 1 bridge over Lynn Creek. That\u2019s something the province anticipates doing but not for 10 years, at least. Whether or not it can be included in the interchange project will depend on federal and provincial funding.<\/p>\n<p>Walton said North Vancouver\u2019s Liberal MPs have shown great interest in coming through with their portion of the money. \u201cThey\u2019re in Ottawa, they\u2019re still working on this, trying to co-ordinate things and asking us questions, trying to make sure they\u2019re moving things forward at their end. It\u2019s optimistic.\u201d<\/p>\n<p>At the request of district staff, the province is also now looking to move the bridge replacement up in the schedule, ahead of a proposed redesign of the Main Street\/Dollarton Highway interchange, Stuart said.<\/p>\n<p>Although not strictly part of this project, the district and province are now also looking to add a new southbound lane on Lynn Valley road under Highway 1 with an aim to better moving the flow of traffic during rush hour, Walton said.<\/p>\n<p>One other group that\u2019s not 100 per cent sold on the current design is cyclists. The ministry is scheduling an extra stakeholder meeting with them to see if the design can be improved, Walton said.<\/p>\n<p>\u201cThat being said, I think there\u2019s recognition that what\u2019s being proposed now is a significant improvement to what is there right now,\u201d Stuart added.<\/p>\n<p>Walton urged patience while the blockbuster concrete and asphalt project rolls out over the next number of years.<\/p>\n<p>\u201cI think what folks would like is some instant improvement but because there are so many connected pieces \u2026 you really need to be finished Phase 2, which is the Fern Street overpass realignment, which is still very much in the design phase, before you\u2019re going to see the kind of fluidity that all the residents in the area would like,\u201d he said. \u201cBut the train has left the station right now. That\u2019s the critical thing.\u201d<\/p>\n<p><em>Click <a href=\"http:\/\/www2.gov.bc.ca\/gov\/content\/transportation\/transportation-infrastructure\/projects\/highway-1-lower-lynn-improvements\/mountain-highway-interchange\" target=\"_blank\">here<\/a> for the B.C. government information about the project.\u00a0<\/em><\/p>\n<p><em>Click <a href=\"http:\/\/www2.gov.bc.ca\/assets\/gov\/driving-and-transportation\/transportation-infrastructure\/projects\/hwy1atmountainhwy\/displayboards_january_19_2016.pdf\" target=\"_blank\">here<\/a> to read a government PDF about the project.<\/em><\/p>\n<p>&#8211; See more at: http:\/\/www.nsnews.com\/news\/district-awaits-decision-on-lynn-creek-bridge-1.2177802#sthash.PZ8uGObh.dpuf<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Basic design work and public consultation for a $50-million redesign of the Mountain Highway interchange is now largely complete, but we are still waiting to hear whether the preferred option involving a new bridge over Lynn Creek eastbound on-ramp for Lynn Valley residents will be funded.<\/p>\n","protected":false},"author":2,"featured_media":538,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"footnotes":""},"categories":[118,117],"tags":[5,21,196,323],"class_list":["post-537","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-city-planning","category-infrastructure","tag-district-of-north-vancouver","tag-lynn-valley","tag-mountain-highway","tag-transit"],"_links":{"self":[{"href":"https:\/\/www.chrisbrownrealestate.ca\/blog\/wp-json\/wp\/v2\/posts\/537"}],"collection":[{"href":"https:\/\/www.chrisbrownrealestate.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.chrisbrownrealestate.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.chrisbrownrealestate.ca\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.chrisbrownrealestate.ca\/blog\/wp-json\/wp\/v2\/comments?post=537"}],"version-history":[{"count":1,"href":"https:\/\/www.chrisbrownrealestate.ca\/blog\/wp-json\/wp\/v2\/posts\/537\/revisions"}],"predecessor-version":[{"id":539,"href":"https:\/\/www.chrisbrownrealestate.ca\/blog\/wp-json\/wp\/v2\/posts\/537\/revisions\/539"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.chrisbrownrealestate.ca\/blog\/wp-json\/wp\/v2\/media\/538"}],"wp:attachment":[{"href":"https:\/\/www.chrisbrownrealestate.ca\/blog\/wp-json\/wp\/v2\/media?parent=537"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.chrisbrownrealestate.ca\/blog\/wp-json\/wp\/v2\/categories?post=537"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.chrisbrownrealestate.ca\/blog\/wp-json\/wp\/v2\/tags?post=537"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}